Case Study: Force Pressure Control

Custom Built Solution to Support Growth

The Client

Force Pressure Control is a leading provider of surface pressure control solutions. Force operates at the forefront of the oilfield services market, establishing itself as a reliable partner for clients across the Eagle Ford, Haynesville, and Permian regions.

The Challenge

As Force experienced significant growth, it became clear that its existing facilities were no longer sufficient to support its expanding operations. Traditional options presented by other build-to-suit developers fell short, offering smaller buildings at higher price points. Force needed a solution that could accommodate its specific requirements without compromising on quality or budget.

The Solution

Enter NRG Realty Group, a key player with a deep understanding of Force’s needs and the real estate market in the Permian Basin. Leveraging our connections, we identified a promising opportunity: a developer with land on FM 715 willing to build to suit. NRG recognized the potential and facilitated an introduction between Force and the developer. This new custom build to suit scope met budgetary constraints and all essential criteria.

The Property

This custom facility totals 32,775 SF across 3 buildings on 13.44 Acres with frontage on FM 715. The buildings include the following: a 21,525 SF wellhead building, an 8,750 SF flow back building, and a 2,500 SF paint booth. All were built with modern finishes to class A standards.

Speak to a broker

Looking for build to suit options?